Your building’s requirements
Know which records you should hold.
A rulebook of UK regulations and standards turns your buildings’ details into the records and duties that apply. The same facts give the same list. AI reads your contracts and planning documents for more. Your requirements land in Drive with responsibilities, dates and source links.
The Fire Safety (England) Regulations 20225
(3) The required information must be provided by the
responsible person—
(a) to a new resident of domestic premises in the
building, as soon as reasonably practicable after that
resident moves into the premises; and
(b) to all residents of domestic premises within the
building, within each period of 12 months beginning
with the date these Regulations come into force.
(4) The responsible person, in relation to a building
which contains two or more sets of domestic premises
and which is above 11 metres in height, must use best
endeavours to undertake checks of fire doors at the
entrances of individual domestic premises in the
building at least every 12 months.
(5) The responsible person must keep a record of the
steps taken to comply with the obligation in paragraph
(4) including in any case where access to the domestic
premises was not granted during any 12 month period,
the steps taken by the responsible person to try and
gain access.
(6) The responsible person in relation to a building
which contains two or more sets of domestic premises
and which is above 11 metres in height, must undertake
checks of any fire doors in communal areas of the
building at least every 3 months.
(7) The checks required by paragraphs (4) and (6) must
include ensuring that the self-closing devices for the
doors are working.
The Regulatory Reform (Fire Safety) Order 20059
Risk assessment
9.—(1) The responsible person must make a suitable
and sufficient assessment of the risks to which
relevant persons are exposed for the purpose of
identifying the general fire precautions he needs to
take to comply with the requirements and prohibitions
imposed on him by or under this Order.
(2) Where a dangerous substance is or is liable to be
present in or on the premises, the risk assessment must
include consideration of the matters set out in Part 1
of Schedule 1.
(3) Any such assessment must be reviewed by the
responsible person regularly so as to keep it up to
date and particularly if—
(a) there is reason to suspect that it is no longer
valid; or
(b) there has been a significant change in the matters
to which it relates including when the premises,
special, technical and organisational measures, or
organisation of the work undergo significant changes,
extensions, or conversions,
and where changes to an assessment are required as a
result of any such review, the responsible person must
make them.
Kestrel Wharf · ScheduleFrom your set-up
Blocks
BlockStoreysHeight (m)Lift count
Beaufort House1855.43
Marlowe Court1133.22
Ashcroft Building618.11
The Foundry514.91
The Regulatory Reform (Fire Safety) Order 200515
Maintenance
17.—(1) Where necessary in order to safeguard the
safety of relevant persons the responsible person must
ensure that the premises and any facilities, equipment
and devices provided in respect of the premises under
this Order or, subject to paragraph (6), under any other
enactment, including any enactment repealed or revoked
by this Order, are subject to a suitable system of
maintenance and are maintained in an efficient state,
in efficient working order and in good repair.
The Lifting Operations and Lifting Equipment Regulations 19986
Thorough examination and inspection
9.—(3) Subject to paragraph (6), every employer shall
ensure that lifting equipment which is exposed to
conditions causing deterioration which is liable to
result in dangerous situations is—
(a) thoroughly examined—
(i) in the case of lifting equipment for lifting
persons or an accessory for lifting, at least every
6 months;
(ii) in the case of other lifting equipment, at least
every 12 months; or
(iii) in either case, in accordance with an
examination scheme; and
The Gas Safety (Installation and Use) Regulations 199822
Duties of landlords
36.—(3) Without prejudice to the generality of
paragraph (2) above, a landlord shall—
(a) ensure that each appliance and flue to which that
duty extends is checked for safety within 12 months
of being installed and at intervals of not more than
12 months since it was last checked for safety
(b) in the case of a lease commencing after the
coming into force of these Regulations, ensure that
each appliance and flue to which the duty extends has
been checked for safety within a period of 12 months
before the lease commences
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 20202
Duties of private landlords
3.—(1) A landlord who grants or intends to grant a
specified tenancy must—
(a) ensure that the electrical safety standards are met
during any period when the residential premises are
occupied under a specified tenancy;
(b) ensure every electrical installation in the
residential premises is inspected and tested at
regular intervals by a qualified person; and
The Smoke and Carbon Monoxide Alarm (England) Regulations 20152
Duty of landlord
4.—(1) A relevant landlord in respect of a specified
tenancy must ensure that—
(a) during any period when the premises are occupied
under the tenancy—
(i) a smoke alarm is equipped on each storey of the
premises on which there is a room used wholly or
partly as living accommodation;
(ii) a carbon monoxide alarm is equipped in any room
of the premises which is used wholly or partly as
living accommodation and contains a fixed combustion
appliance other than a gas cooker;
Project Drive
Why required
Fire Safety (England) Regulations 2022, regulation 10(6)
“The responsible person in relation to a building which contains two or more sets of domestic premises and which is above 11 metres in height, must undertake checks of any fire doors in communal areas of the building at least every 3 months.”Read more
Project set-up · Blocks
All 4 blocks are above 11 metres.
Explains why this was raised — never satisfies it.
View full details
Oakfield Gardens · Employer’s RequirementsPage 18 of 142
7Fire safety
7.1The Contractor shall design and construct the Works
so that each Block meets the requirements of Part B
of Schedule 1 to the Building Regulations 2010.
7.2The Contractor shall retain the Fire Engineer until
the Completion Date of the last Block.
7.3The Contractor shall install the fire safety measures
in the Fire Statement approved under the Planning
Permission.
7.4Fire safety information
7.4.1For each Block, not later than 14 days before its
Completion Date, the Contractor shall deliver:
(a)the fire strategy;
(b)the fire door schedule;
(c)the sprinkler commissioning certificate;
(d)the fire alarm commissioning certificate; and
(e)the smoke control commissioning certificate.
7.4.2The information shall be sufficient for the
responsible person to operate and maintain each
Block with reasonable safety.
7.5Fire doors
7.5.1Every fire doorset shall be third-party certified
and labelled with its certification number.
7.5.2The Contractor shall record each doorset in the
fire door schedule with its location and rating.
The Building Regulations 201047
Part B Fire safety
Means of warning and escape
B1. The building shall be designed and constructed so
that there are appropriate provisions for the early
warning of fire, and appropriate means of escape in
case of fire from the building to a place of safety
outside the building capable of being safely and
effectively used at all material times.
Internal fire spread (linings)
B2.—(1) To inhibit the spread of fire within the
building, the internal linings shall—
(a) adequately resist the spread of flame over their
surfaces; and
(b) have, if ignited, either a rate of heat release or a
rate of fire growth, which is reasonable in the
circumstances.
Internal fire spread (structure)
B3.—(1) The building shall be designed and constructed
so that, in the event of fire, its stability will be
maintained for a reasonable period.
External fire spread
B4.—(1) The external walls of the building shall
adequately resist the spread of fire over the walls and
from one building to another, having regard to the
height, use and position of the building.
21/04127/OUT · Decision noticePage 3 of 6
Conditions
7.No development above slab level shall take place
until samples of the external materials have been
submitted to and approved in writing by the Local
Planning Authority.
Reason: In the interests of the character of the area.
8.The development shall be carried out in accordance
with the approved Construction Management Plan.
9.No dwelling shall be occupied until a landscaping
scheme has been submitted to and approved in
writing by the Local Planning Authority.
Reason: In the interests of visual amenity.
10.The approved landscaping shall be planted in the
first season after the last dwelling is occupied.
11.No construction work shall take place outside 08:00
to 18:00 on weekdays and 08:00 to 13:00 on Saturdays.
12.No development shall commence until a surface
water drainage strategy has been submitted to and
approved in writing by the Local Planning Authority.
Reason: To prevent flooding on and off the site.
The Building Regulations 201041
Pressure testing
43.—(1) This regulation applies to the erection of a
building in relation to which paragraph L1(a)(i) of
Schedule 1 imposes a requirement.
(2) Where this regulation applies, the person carrying
out the work shall, for the purpose of ensuring
compliance with regulation 26 and regulation 26A and
paragraph L1(a)(i) of Schedule 1—
(a) ensure that—
(i) pressure testing is carried out in such
circumstances as are approved by the Secretary of
State; and
(ii) the testing is carried out in accordance with a
procedure approved by the Secretary of State; and
(b) subject to paragraph (5), give notice of the results
of the testing to the building control authority.
(3) The notice referred to in paragraph (2)(b) shall—
(a) record the results and the data upon which they
are based in a manner approved by the Secretary of
State; and
(b) be given to the building control authority not
later than seven days after the final test is carried
out.
21/04127/OUT · Decision noticePage 4 of 6
16.No development shall commence until a scheme of
noise mitigation for the dwellings facing Station
Road has been submitted to and approved in writing
by the Local Planning Authority.
Reason: To protect the living conditions of residents.
17.Refuse storage shall be provided in accordance with
the approved plans before each Block is occupied.
18.No Block shall be occupied until the fire safety
measures in the approved Fire Statement have been
installed.
Reason: In the interests of fire safety.
19.Cycle parking shall be provided before occupation.
20.External lighting shall accord with the approved plan.
21.Before each dwelling is first occupied, an electric
vehicle charging point shall be installed for it.
Reason: To promote sustainable transport.
Informative
This permission is subject to a planning obligation
under section 106 of the Town and Country Planning
Act 1990.
Oakfield Gardens · Employer’s RequirementsPage 31 of 142
14Completion and handover
14.1The Employer’s Agent shall inspect each Dwelling
before its Completion Date.
14.2The Contractor shall give the Employer four weeks’
notice of the Completion Date of each Section.
14.3Handover documents
14.3.1Not later than 14 days before the Completion Date
of each Section, the Contractor shall deliver to the
Employer, for each Dwelling in that Section:
(a)the Energy Performance Certificate;
(b)the as-built SAP calculation;
(c)the electrical installation certificate;
(d)the Gas Safe certificate;
(e)the water regulations certificate;
(f)the building control completion certificate; and
(g)the structural warranty cover note.
14.3.2Each document shall name the Dwelling by its plot
number and postal address.
14.4Defects
14.4.1The Contractor shall make good any defect notified
during the Rectification Period.
Oakfield Gardens · Employer’s RequirementsPage 36 of 142
14.6Operation and maintenance information
14.6.1The Contractor shall deliver the operation and
maintenance manual for each Dwelling type and for
the common parts of each Block.
14.7Product warranties
14.7.1The Contractor shall assign to the Employer the
manufacturer’s warranty for every installed product
and appliance, by Dwelling.
14.8Collateral warranties
14.8.1The Contractor shall procure a collateral warranty
from each Sub-Contractor with design responsibility.
14.9Utilities
14.9.1The Contractor shall deliver the connection
certificates and meter readings for each Dwelling.
14.10Keys
14.10.1The Contractor shall deliver two sets of keys for
each Dwelling, labelled with its plot number.
Project Drive
Why required
Building Regulations 2010, Part B
“The building shall be designed and constructed so that there are appropriate provisions for the early warning of fire, and appropriate means of escape in case of fire from the building to a place of safety outside the building capable of being safely and effectively used at all material times.”Read more
Employer’s Requirements, Clause 7.4.1(a) · Page 18
“For each Block, not later than 14 days before its Completion Date, the Contractor shall deliver: (a) the fire strategy;”
21/04127/OUT, Condition 18
“No Block shall be occupied until the fire safety measures in the approved Fire Statement have been installed.”
View full details